Residential

Edmondson Park Subdivision

Comprehensive civil engineering design for a large residential subdivision delivering 550+ lots across staged releases.

Location

South West Sydney, NSW

Completed

2024

Client

Private Developer

Sector

Residential

01

The challenge

The site presented complex stormwater management challenges, including a constrained downstream discharge point and significant fall across the developable area. Council required the development to demonstrate no worsening of existing flood behaviour, while the client needed to protect the proposed lot yield and maintain project viability.

02

Our solution

Our team developed an integrated stormwater and flood management strategy that addressed the site's challenging topography, limited downstream discharge capacity and Council's no-worsening flood requirements. By integrating hydraulic engineering with the site layout and development objectives, we delivered a practical, compliant and cost-effective solution.

  • Hydraulic and flood assessment to understand existing flood behaviour and identify key constraints across the site.
  • Optimised site grading and drainage design to work with the significant natural fall while maximising the usable development area.
  • Strategic stormwater detention and flow control to manage post-development flows and reduce impacts on the downstream drainage network.
  • Carefully designed overland flow paths to safely convey major stormwater flows and maintain acceptable flood behaviour.
  • Coordination with the development layout to protect the proposed lot yield without compromising stormwater and flood performance.
  • Early consideration of Council requirements to develop a practical design that could be supported through the approval process.

03

The outcome

The integrated stormwater and flood management strategy successfully balanced Council's flood management requirements with the client's development objectives, and the final design was delivered within the agreed budget and timeframe.

  • No worsening of flood behaviour, satisfying Council's key flood management requirements.
  • Protection of the proposed lot yield, maximising the development potential of the site.
  • Effective management of stormwater runoff despite the constrained downstream discharge point.
  • Safe and practical overland flow paths that addressed major stormwater events.
  • A cost-effective and buildable drainage solution without unnecessary impacts on the development layout.
  • Delivery within the agreed budget and timeframe, supporting a smoother development approval and project delivery process.

The result was a balanced hydraulic design that made the most of a challenging site while meeting regulatory requirements and protecting the client's investment. This project demonstrates our expertise in stormwater drainage design, flood modelling, hydraulic engineering and development approvals.

Project gallery

On site and in delivery

Edmondson Park Subdivision — view 1
Edmondson Park Subdivision — view 2
Edmondson Park Subdivision — view 3

Get in touch

Let's build something great together

Send through your drawings, survey or site address and we will come back with a clear scope and fee proposal.

Quick enquiry

Talk to an engineer

Message us on WhatsApp for project enquiries, fee proposals and drawing reviews.

WhatsApp